Hydropower design reports, channel bathymetry and dam management plans along the Trishuli corridor — IFC, NWEDC and NEA
- Outcome
- Completed
- Search date
- Source
- IFC, NWEDC, NEA & Trishuli Jal Vidhyut
- Reference
- RUN-20260915-055
- Aim
- Recover engineering hydraulic baselines, river cross-sections, design hydrographs, and infrastructure vulnerability assessments for hydropower cascades along the Bhote Koshi and Trishuli rivers.
- Source and interface
- IFC, NWEDC, NEA & Trishuli Jal Vidhyut — IFC Project Disclosures / NWEDC / NEA Publications
- Search method
- Query IFC disclosure portal for Upper Trishuli-1 (Project 35701) Dam Management Plan and Environmental Flows Assessment; query NWEDC and Trishuli Jal Vidhyut for Upper Trishuli-3B design specifications; query MoFE for Rasuwagadhi HPP transmission-line EIA. Retrieve public engineering documents and baseline data.
- Criteria
Criterion All languages. Trishuli and Bhote Koshi hydropower projects (UT-1, UT-3B, Rasuwagadhi). Baseline engineering documentation. - Coverage
- Detailed reach-scale channel geometry, rating curves, flood frequency estimates (100-year and PMF), and geotechnical slope stability reports along the corridor.
- Stopping rule
- Exhaust publicly disclosed engineering reports and environmental/social impact disclosures for the targeted hydropower schemes.
- Result
3 hydropower engineering resources recovered across 6 assets: Upper Trishuli-1 Dam Management Plan & E-Flows bathymetry, Upper Trishuli-3B Detailed Design Report, and Rasuwagadhi HPP EIA.
Resource links below show the completed assessment outcomes. The search result above records discovery at the search date.
UpperTrishuli1 Environmental and Social Review Summary, IFC project35701

