- Assessment date
- 28 September 2026
- Decision
- Exclude
- Reason
- The specific Rasuwagadhi EIA and annex identities were not established through original native records; the supplied MoFEroute could not be inspected. Exclude these unverified named holdings from eligible counts while preserving the discovery record.
- Resource reference
- rec_5c34d678-3456-789a-bcde-f01234567803
Source evidence
Asset decisions
These decisions remain in the assessment ledger. The assets below are outside the included asset index.
| Asset | Outcome | Reason |
|---|---|---|
| Environmental Impact Assessment of Rasuwagadhi Hydroelectric Project (111 MW)acand_5c34d678-3456-789a-bcde-f01234567801 | Exclude | The specific Rasuwagadhi EIA and annex identities were not established through original native records; the supplied MoFEroute could not be inspected. Exclude these unverified named holdings from eligible counts while preserving the discovery record. |
| Rasuwagadhi HPP Geotechnical and Slope Stability Annexesacand_5c34d678-3456-789a-bcde-f01234567802 | Exclude | The specific Rasuwagadhi EIA and annex identities were not established through original native records; the supplied MoFEroute could not be inspected. Exclude these unverified named holdings from eligible counts while preserving the discovery record. |
Download all resource decisions · Download all asset decisions

