- Assessment date
- 28 September 2026
- Decision
- Exclude
- Reason
- The named UpperTrishuli3B designPDF returns404 and no native original attachment was established. The existence of the company does not verify this document or the claimed numerical engineering content.
- Resource reference
- rec_4b23c567-2345-6789-abcd-ef0123456702
Source evidence
Asset decisions
These decisions remain in the assessment ledger. The assets below are outside the included asset index.
| Asset | Outcome | Reason |
|---|---|---|
| Upper Trishuli-3B Hydroelectric Project Detailed Design Report Volume II: Hydrology and Hydraulicsacand_4b23c567-2345-6789-abcd-ef0123456701 | Exclude | The named UpperTrishuli3B designPDF returns404 and no native original attachment was established. The existence of the company does not verify this document or the claimed numerical engineering content. |
| Upper Trishuli-3B Engineering Drawings, Spillway Rating Curves and Hydraulic Geometryacand_4b23c567-2345-6789-abcd-ef0123456702 | Exclude | The named UpperTrishuli3B designPDF returns404 and no native original attachment was established. The existence of the company does not verify this document or the claimed numerical engineering content. |
Download all resource decisions · Download all asset decisions

