Back to assessment decisions

Upper Trishuli-3B Hydroelectric Project — Detailed Engineering Design and Flood Frequency Report (NEA)

Excluded from the assessed catalogue

Assessment date
28 September 2026
Decision
Exclude
Reason
The named UpperTrishuli3B designPDF returns404 and no native original attachment was established. The existence of the company does not verify this document or the claimed numerical engineering content.
Resource reference
rec_4b23c567-2345-6789-abcd-ef0123456702

Source evidence

Asset decisions

These decisions remain in the assessment ledger. The assets below are outside the included asset index.

AssetOutcomeReason
Upper Trishuli-3B Hydroelectric Project Detailed Design Report Volume II: Hydrology and Hydraulicsacand_4b23c567-2345-6789-abcd-ef0123456701ExcludeThe named UpperTrishuli3B designPDF returns404 and no native original attachment was established. The existence of the company does not verify this document or the claimed numerical engineering content.
Upper Trishuli-3B Engineering Drawings, Spillway Rating Curves and Hydraulic Geometryacand_4b23c567-2345-6789-abcd-ef0123456702ExcludeThe named UpperTrishuli3B designPDF returns404 and no native original attachment was established. The existence of the company does not verify this document or the claimed numerical engineering content.