Completed catalogue assessment
- Eligibility decision
- Include · Include
- Assessment date
- 28 September 2026
- Decision reason
- Original CHWRR technical report was read as text and contains attributed event chronology and discharge/volume estimates. Internal station-label and volume-interval ambiguities are retained; no independent calibration is claimed.
- Metadata corrections
- {}
Identity and coverage
- Catalogue identifier
- rec_1c73fc60-9f5a-5af8-b7d0-223b898e2c2a
- Original-title language
- Nepali
- English-title status
- Under review
- Persistent identifier
- Not stated
- Resource version
- Not stated
- Publication date
- Not stated
- Last updated
- Not stated
- Metadata reviewed
- 28 September 2026
- Language
- Nepali
- Geographic coverage
- Nepal
- Bounding box (WGS 84)
- Not stated
- Temporal coverage
- Not stated; 26 August 2026 Event
- Themes
- Not stated
Method and provenance
- Production method
- Not stated
- Provenance
- Original CHWRR technical report was read as text and contains attributed event chronology and discharge/volume estimates. Internal station-label and volume-interval ambiguities are retained; no independent calibration is claimed.
- Validation
- Not Performed By Catalogue Review
- Uncertainty
- Catalogue eligibility does not establish scientific validation.
- Limitations
- Not stated
Access and reuse
- Access
- Source Specific Conditions; open access route
- Licence
- Not verified
- Redistribution
- Metadata and links only; third-party files are not redistributed
- Catalogue status
- Included
- Provider page
- Open authoritative resource page
Assets
1 assetPreliminary technical report on the 26 August 2026 Bhote Koshi–Trishuli–Narayani flood — Nepal CHWRR
Asset bounding box not stated. Parent resource coverage: Nepal

