Back to assessment decisions

Nepal Electricity Authority Technical Damage Assessment: Trishuli River Basin Hydropower Installations

Excluded from the assessed catalogue

Assessment date
28 September 2026
Decision
Excluded Unverified Resource Identity
Reason
The claimed NEA technical damage assessment and hydropower forensic ledger point only to the agency homepage, which returns HTML rather than the alleged PDF. Original-source searches did not establish this exact attachment or the claimed diver/structural validation method. Exclude the claimed report and all unsupported size, geographic, rights and validation metadata; agency news or secondary loss estimates are not substitutes for this ledger.
Resource reference
res-60d330e7-8fc8-5dba-94db-d35efcfa6e4a

Metadata corrections

Remove Unverified Method Rights Geography Validation Claims
true

Source evidence

Asset decisions

These decisions remain in the assessment ledger. The assets below are outside the included asset index.

AssetOutcomeReason
Hydropower Generation Capacity Outage and Physical Damage Ledger (Trishuli Cascade)ast-2aa3a592-92ac-5c0c-95af-0645e88e22f6ExcludeThe claimed NEA technical damage assessment and hydropower forensic ledger point only to the agency homepage, which returns HTML rather than the alleged PDF. Original-source searches did not establish this exact attachment or the claimed diver/structural validation method. Exclude the claimed report and all unsupported size, geographic, rights and validation metadata; agency news or secondary loss estimates are not substitutes for this ledger.