Completed catalogue assessment
- Eligibility decision
- Include · Include
- Assessment date
- 28 September 2026
- Decision reason
- Original source identity and relevant content established; exact unsupported metadata replaced and evidential limits recorded.
- Metadata corrections
- {"resource_version":"Version 5","last_updated":"2026-09-09","access_url":"https://eartharxiv.org/repository/object/14687/download/25908/","production_method":"Reconstructs gauge-specific arrival brackets from ten-minute stage series and telemetry loss, compares these with reported alert dispatch, and evaluates conditional warning and frictional-melting scenarios.","provenance_summary":"Version 5 full text names Sunim Acharya and Animesh Paudel; the landing page still lists Acharya alone. First published 29 August and updated 9 September 2026. The exact data release cited by v5 is DOI 10.5281/zenodo.22679444, version 3.0.0.","uncertainty_summary":"Telemetry-loss arrival brackets assume that flood arrival caused the loss rather than an earlier power or backhaul failure. Dispatch does not establish delivery, receipt, or action. Counterfactual two- and five-minute alerts are assumptions, not operational validation.","limitations":"Preprint, not peer reviewed. Full text and repository metadata differ in authorship. Table 3 gives an inconsistent Devghat lead time relative to its 14:30–14:40 arrival bracket; flag this source error rather than repeat it.","reviewed_on":"2026-09-28","current_status":"eligibility_assessed"}
Identity and coverage
- Catalogue identifier
- res-73f9541b-65fc-4055-b4a4-a177b978c017
- Persistent identifier
- 10.31223/x5hn5h
- Resource version
- Version 5
- Publication date
- 29 August 2026
- Last updated
- 9 September 2026
- Metadata reviewed
- 28 September 2026
- Language
- English
- Geographic coverage
- Langtang and Lhende Khola source area and the Bhote Koshi–Trishuli–Narayani river corridor in central Nepal.
- Bounding box (WGS 84)
- Not stated
- Temporal coverage
- 26 August 2026; Event Analysis
- Themes
- Early Warning, Hydrology, Flood Propagation, Cryosphere, Disaster Impacts, Infrastructure
Method and provenance
- Production method
- Reconstructs gauge-specific arrival brackets from ten-minute stage series and telemetry loss, compares these with reported alert dispatch, and evaluates conditional warning and frictional-melting scenarios.
- Provenance
- Version 5 full text names Sunim Acharya and Animesh Paudel; the landing page still lists Acharya alone. First published 29 August and updated 9 September 2026. The exact data release cited by v5 is DOI 10.5281/zenodo.22679444, version 3.0.0.
- Validation
- Not Peer Reviewed
- Uncertainty
- Telemetry-loss arrival brackets assume that flood arrival caused the loss rather than an earlier power or backhaul failure. Dispatch does not establish delivery, receipt, or action. Counterfactual two- and five-minute alerts are assumptions, not operational validation.
- Limitations
- Preprint, not peer reviewed. Full text and repository metadata differ in authorship. Table 3 gives an inconsistent Devghat lead time relative to its 14:30–14:40 arrival bracket; flag this source error rather than repeat it.
Access and reuse
- Access
- Direct Open; open access route
- Licence
- CC-BY-4.0; licence evidence
- Redistribution
- Permitted Under Stated Licence
- Catalogue status
- Included
- Provider page
- Open authoritative resource page
Assets
2 assetsThe Bhote Koshi–Trishuli flash flood of 26 August 2026, Rasuwa, Nepal: warning latency exceeded flood travel time — version 5
Asset bounding box not stated. Parent resource coverage: Langtang and Lhende Khola source area and the Bhote Koshi–Trishuli–Narayani river corridor in central Nepal.
The Bhote Koshi–Trishuli flash flood of 26 August 2026, Rasuwa, Nepal: warning latency exceeded flood travel time — version 4
Asset bounding box not stated. Parent resource coverage: Langtang and Lhende Khola source area and the Bhote Koshi–Trishuli–Narayani river corridor in central Nepal.

