Situation Report No. 1: World Vision International Nepal — Nepal Flash Floods Response 2026
EnglishNepal Flash Floods Situation Report 1, 03 September 2026
Operational Report
Dataset Specifications
| Packaged contents | 2 pages published 3 September 2026 with information current to 2 September. |
|---|---|
| Spatial extent | Parent resource coverage: Rasuwa, Nuwakot, Dhading, and surrounding affected districts in Nepal. |
| Temporal coverage | 26 August 2026 to 2 September 2026Humanitarian & Emergency Response · Disaster relief and situation monitoring |
| Source & contributor | World Vision International NepalHost platform: World Vision International |
| Parent collection | Situation Report No. 1: World Vision International Nepal — Nepal Flash Floods Response 2026 |
| Format & size | PDF · 532.4 KiB · application/pdf |
| Licence & access | Tool Dependent Access Outcome · No Asset Specific Reuse Grant Established — not_stated |
| Lineage & documentation | Documented in the source report |
Catalogue assessment and metadata evidenceAssessment recorded
Completed catalogue decisions are recorded separately from technical inspection and scientific validation. Access and metadata evidence retain their original dates and scope.
Completed catalogue assessment
- Eligibility decision
- Include · Included Documentary Evidence
- Assessment date
- 28 September 2026
- Decision reason
- The original World Vision report is dated 3 September, with figures as of 2 September. The official landing page links the exact 2-page PDF; web text extraction succeeded although the separate direct Python GET returned 403. Reported displacement, people assisted and response targets are distinct quantities, not interchangeable validated totals.
- Information role
- Operational Report
- Scientific validation
- not_performed_by_catalogue_review
- Access assessment
- original_pdf_text_available_via_web_tool; direct_python_get_403
- Rights assessment
- Not Stated
- Assessment evidence
Included data · Metadata assessed 6 September 2026
Reachable without registration · Direct Open · checked 6 September 2026

