IRDR Special Report: Risk Assessment of Debris Flows along the China–Nepal Transportation Corridor
EnglishIRDR Special Report: Risk assessment of Debris Flows along the China-Nepal Transportation Corridor
Scientific Or Technical Report
Dataset Specifications
| Packaged contents | 7 pages covers 1,021 catchments and classifies hazard and road risk along the corridor. |
|---|---|
| Spatial extent | Parent resource coverage: China–Nepal transportation corridor, including the Lhasa–Zhangmu and Lhasa–Gyirong sections and debris-flow catchments in the Tibet Autonomous Region of China. |
| Temporal coverage | Until 30 August 2026Historical Baseline · Baseline record spanning 2026 |
| Source & contributor | Qiang Zou; Peng Cui; Bin Zhou; Yu Lei; Siyu ChenHost platform: Integrated Research on Disaster Risk (IRDR) |
| Parent collection | IRDR Special Report: Risk Assessment of Debris Flows along the China–Nepal Transportation Corridor |
| Format & size | PDF · 1.2 MiB · application/pdf |
| Licence & access | Public Route Or Response Documented · No Asset Specific Reuse Grant Established — not_stated |
| Lineage & documentation | Documented in the source report |
Catalogue assessment and metadata evidenceAssessment recorded
Completed catalogue decisions are recorded separately from technical inspection and scientific validation. Access and metadata evidence retain their original dates and scope.
Completed catalogue assessment
- Eligibility decision
- Include · Included Documentary Evidence
- Assessment date
- 28 September 2026
- Decision reason
- The original 7-page IRDR special report is a corridor debris-flow risk assessment. Its long-term susceptibility and infrastructure exposure findings are contextual; do not relabel them as a measured event-specific length of destroyed road.
- Information role
- Scientific Or Technical Report
- Scientific validation
- not_performed_by_catalogue_review
- Access assessment
- Retrieved Public Native Body
- Rights assessment
- Not Stated
- Assessment evidence
Included data · Metadata assessed 6 September 2026
Reachable without registration · Direct Open · checked 28 September 2026

