Rapid Analysis Report: Scientific Anatomy of the 26 August 2026 Bhotekoshi Flash Flood
Scientific Or Technical Report
Dataset Specifications
| Packaged contents | 9 pages the PDF names six contributors and three reviewers. |
|---|---|
| Spatial extent | Parent resource coverage: Suspected source area around Deding and Langtang and the Bhotekoshi–Trishuli corridor through Rasuwa, Nuwakot, Dhading, and Chitwan districts, Nepal. |
| Temporal coverage | 25 August 2026 to 28 August 2026Disaster Event Analysis · Physical cascade reconstruction |
| Source & contributor | Basanta Raj Adhikari; Deepak Marahatta; Rita Thakuri; Sasmita Poudel; Suman Chapagain; Suraj GautamHost platform: Integrated Research on Disaster Risk (IRDR) |
| Parent collection | Rapid Analysis Report: Scientific Anatomy of the 26 August 2026 Bhotekoshi Flash Flood |
| Format & size | PDF · 737.5 KiB · application/pdf |
| Licence & access | Public Route Or Response Documented · No Asset Specific Reuse Grant Established — not_stated |
| Lineage & documentation | Documented in the source report |
Catalogue assessment and metadata evidenceAssessment recorded
Completed catalogue decisions are recorded separately from technical inspection and scientific validation. Access and metadata evidence retain their original dates and scope.
Completed catalogue assessment
- Eligibility decision
- Include · Included Documentary Evidence
- Assessment date
- 28 September 2026
- Decision reason
- The original 9-page IRDR scientific-anatomy report was retrieved. The early account is explicitly a rapid analysis and advances a temporary-blockage hypothesis; it is not proof of a 25 August detachment or an 18–19 hour dam lifetime. Preserve the report as early documentary scientific evidence with those limitations.
- Information role
- Scientific Or Technical Report
- Scientific validation
- not_performed_by_catalogue_review
- Access assessment
- Retrieved Public Native Body
- Rights assessment
- Not Stated
- Assessment evidence
Included data · Metadata assessed 6 September 2026
Reachable without registration · Direct Open · checked 28 September 2026

