Rapid Hazard Assessment Report (RHA Report No. NP3)
Scientific Or Technical Report
Dataset Specifications
| Packaged contents | 6 pages report number, authors, and last-update date are printed in the PDF. |
|---|---|
| Spatial extent | Parent resource coverage: Lirung massif and Lhende catchment at the Nepal–China border, with the downstream Bhote Koshi–Trishuli corridor to Ghalchhi and beyond. |
| Temporal coverage | 25 August 2026 to 28 August 2026Event / Post-Event Assessment · Observation dates: 2026–2026 |
| Source & contributor | Q. Liu; A. Khatri; A. Lord; M. Ghouli; N. Thapa; J. Steiner; W. W. Immerzeel; S. AllenHost platform: HiRISK consortium |
| Parent collection | Rapid Hazard Assessment Report (RHA Report No. NP3) |
| Format & size | PDF · 1.1 MiB · application/pdf |
| Licence & access | Public Route Or Response Documented · No Asset Specific Reuse Grant Established — not_stated |
| Lineage & documentation | Documented in the source report |
Catalogue assessment and metadata evidenceAssessment recorded
Completed catalogue decisions are recorded separately from technical inspection and scientific validation. Access and metadata evidence retain their original dates and scope.
Completed catalogue assessment
- Eligibility decision
- Include · Included Documentary Evidence
- Assessment date
- 28 September 2026
- Decision reason
- The original 6-page HiRISK RHA NP3 report was retrieved and text examined. It is an early rapid hazard assessment updated 28 August. Its internal timing descriptions are not mutually consistent; retain the proposed process sequence as a preliminary attributed interpretation, not an independently established event clock.
- Information role
- Scientific Or Technical Report
- Scientific validation
- not_performed_by_catalogue_review
- Access assessment
- Retrieved Public Native Body
- Rights assessment
- Not Stated
- Assessment evidence
Included data · Metadata assessed 6 September 2026
Reachable without registration · Direct Open · checked 28 September 2026