Nepal Flood Response Situation Report No. 1, 27 August 2026
EnglishIOM Nepal Flood SitRep
Operational Report
Dataset Specifications
| Packaged contents | 3 pages produced by IOM and mirrored by ReliefWeb. |
|---|---|
| Spatial extent | Parent resource coverage: Rasuwa, Nuwakot, and Dhading districts and the Rasuwagadhi–Bhote Koshi–Trishuli corridor in central Nepal. |
| Temporal coverage | 26 August 2026 to 27 August 2026Humanitarian & Emergency Response · Disaster relief and situation monitoring |
| Source & contributor | International Organization for Migration (IOM) NepalListed as: International Organization for Migration (IOM)Host platform: ReliefWeb |
| Parent collection | Nepal Flood Response Situation Report No. 1, 27 August 2026 |
| Format & size | PDF · 5.84 MB · application/pdf |
| Licence & access | Public Route Or Response Documented · No Asset Specific Reuse Grant Established — not_stated |
| Lineage & documentation | Documented in the source report |
Catalogue assessment and metadata evidenceAssessment recorded
Completed catalogue decisions are recorded separately from technical inspection and scientific validation. Access and metadata evidence retain their original dates and scope.
Completed catalogue assessment
- Eligibility decision
- Include · Included Documentary Evidence
- Assessment date
- 28 September 2026
- Decision reason
- The original 3-page IOM Situation Report 1 is dated 27 August. Early impact and displacement figures are reported estimates; causal descriptions are tentative. Retain as a dated operational situation report, not a harmonised census or engineering dataset.
- Information role
- Operational Report
- Scientific validation
- not_performed_by_catalogue_review
- Access assessment
- Retrieved Public Native Body
- Rights assessment
- Not Stated
- Assessment evidence
Included data · Metadata assessed 6 September 2026
Reachable without registration · Direct Open · checked 28 September 2026

